Home » Posts tagged with » 3-16-15

Harbor Blvd. FINALLY being resurfaced

Harbor Blvd. FINALLY being resurfaced

By George Miller Harbor Boulevard is being resurfaced with a 1″ cap from W. 5th Street down to Channel Islands Blvd. in Oxnard this week (it looked thicker). Estimated life is five+ years and we are told that the cost per year is the same as a more extensive repaving, given the starting road condition. Failure to […]